Featured Projects

Click the links to learn about each project

Educational Institutions

Madison Central High School HVAC and Interior Improvements – Phase 1 , 2 & 3

Client: Madison County School District

Project Location: Madison, MS

Project Scope:

  • Comprehensive engineering services including design team coordination, mechanical and plumbing design, financial estimating, bidding, and construction administration.

  • Major HVAC modernization across approximately 127,000 SF of facility space.

  • Infrastructure upgrade replacing 31 constant volume water source heat pumps with high-efficiency variable volume units.

  • Enhanced occupancy comfort through the implementation of individual temperature controls for all classroom and administrative spaces.

  • Indoor Air Quality improvement via the installation of advanced mechanical air cleaners throughout the facility.

  • Building Management System (BMS) integration featuring new digital controls for optimized energy performance and system monitoring.

University of Mississippi – Natural Products & Faser Hall HVAC Controls Upgrade

(Phase II)

Client: University of Mississippi

Project Location: Oxford, MS

Project Scope:

  • Phase II HVAC controls upgrade for two occupied laboratory buildings totaling over 188,000 sqft.

  • Laboratory-focused project to increase building comfort, pressurization, safety, and energy efficiency.

  • Retrofit of existing supply/exhaust air Phoenix valves and fume hoods with new Direct Digital Controls (DDC).

  • Addition of new DDC control valves for laboratory heating water coils.

  • Specialized scope for the Natural Products Vivarium to provide individual room pressure control and ductwork modifications.

Status: Ongoing

Carver Elementary Cooling Tower Replacement ESSER III

Client: Meridian Public School District

Project Location: Meridian, MS

Project Scope:

  • Relocation of an existing cooling tower from Meridian High School to a new enclosure at Carver Elementary School.

  • Demolition and removal of the existing cooling tower at Carver Elementary.

  • Construction of a new fenced-in limestone enclosure on a new concrete pad with structural framing for the relocated tower.

  • Installation of a new condenser water pump and new underground condenser water piping run from the existing mechanical room.

  • Integration of the relocated cooling tower with the existing Building Management System (BMS).

  • Reuse of the existing chiller, which remained operational during construction.

Status: Completed 2025

Richland High School Renovations

Client: Rankin County School District

Project Location: Richland, MS

Project Scope:

  • New construction of a two-story educational facility totaling approximately 51,445 square feet.

  • Comprehensive engineering design and construction administration for HVAC, plumbing, and fire protection systems.

  • First-floor instructional and administrative wing (26,470 SF) featuring a library, computer lab, choral center, technology/discovery rooms, and office suites.

  • Second-floor specialized laboratory wing (24,975 SF) including biology and chemistry labs, a general science lab, an art room, and a food lab.

  • Customized system integration to support diverse programmed spaces, ranging from high-occupancy choral areas to specialized laboratory ventilation and plumbing requirements.

Madison Central Auditorium Chiller Replacement

Client: Madison County School District

Project Location: Madison, MS

Project Scope:

  • Removal of the existing air-cooled chiller serving the auditorium.

  • Installation of a new air-cooled chiller on the existing equipment pad.

  • Installation of new exterior chilled water piping to connect to the existing system.

  • Work was performed while the building was occupied, requiring coordination to minimize disruption.

Status: Completed 2025

Velma Jackson Gymnasium HVAC Upgrades

Client: Madison County Schools

Project Location: Camden, MS

Project Scope:

  • Complete HVAC upgrades for the ~18,000 sqft gymnasium.

  • Demolition and removal of existing condensing units , air handling units (AHUs) , a makeup air unit (MAU) , and associated ductwork and piping.

  • Installation of new condensing units on the existing concrete pad.

  • Installation of new indoor twinned furnaces , a new Dedicated Outdoor Air System (DOAS) , and a new Energy Recovery Ventilator (ERV).

  • Work includes new ductwork , propane gas piping , and fire dampers.

  • An alternate includes the replacement of two additional condensing units and their associated indoor cooling-only air handlers.

Status: Completed 2024

Healthcare Facilities

Grenada USP 797 Pharmacy Renovations

Client: University of Mississippi Medical Center

Project Location: Jackson, MS

Project Scope:

  • Provided the design to upgrade the Grenada Hospital Pharmacy to meet the new compounding guidelines of USP 797

  • Retrofitted the current system to provide adequate air changes per hour and room pressurization

  • Provided construction administration for project

Status: Completed

UMMC Teaching Kitchen Renovation

Client: University of Mississippi Medical Center (UMMC)

Project Location: Jackson, MS

Project Scope:

  • Renovation of an existing space to create a new teaching kitchen, classroom, and support areas.

  • Mechanical scope included demolition of existing equipment and installation of two new split system heat pumps and associated ductwork.

  • Installation of five recirculating kitchen hoods, each with integrated fire detection and suppression systems.

  • Plumbing scope included a new 120-gallon electric water heater, a grease interceptor, and all piping for kitchen equipment and new restrooms.

  • Extension of the existing fire sprinkler system into the renovated areas.

Senior Living
and Long-Term Care

Madison County Nursing Home HVAC Renovations

Client: Madison County Nursing Home

Project Location: Canton, MS

Project Scope:

  • Complete HVAC renovation for the occupied ~64,000 sqft facility, requiring extensive phasing to minimize disruption to residents.

  • Replacement of two chillers with new ~90-ton air-cooled units and two boilers with new 1,000 MBH condensing units, including new primary/secondary pump systems.

  • Replacement of existing fan coil units in all resident rooms and hallways with a new mini-split system.

  • Replacement of multiple rooftop dedicated outdoor air systems (DOAS) and air handling units (AHUs) serving resident wings, the nurse station, and common areas like the dining room, kitchen, and gym.

  • Replacement of the specialized kitchen ventilation unit (KVU) and the natatorium (pool area) unit.

Status: Under Construction

Religious and Worship Facilities

First Baptist Church Renovations

Client: First Baptist Church

Project Location: Jackson, MS

Project Scope:

  • Major renovation and expansion of an existing worship and education facility, including a sanctuary expansion to 3,400 seats and a new 1,500-seat fellowship hall.

  • Comprehensive engineering design and construction administration for HVAC, plumbing, and fire protection systems.

  • Building additions featuring new classroom wings, administrative office suites, and dedicated kitchen/dining areas.

  • Central plant infrastructure upgrades including new centrifugal chillers, boilers, and high-capacity air handling systems.

  • Detailed construction phasing and coordination to ensure the continuity of existing facility services throughout the project duration.

Saint Luke Methodist Church HVAC Mechanical Plant Upgrades

Client: Saint Luke Methodist Church

Project Location: Jackson, MS

Project Scope:

  • Complete HVAC mechanical plant upgrades for the occupied facility.

  • Removal of the existing cooling tower, chiller, pumps, and expansion tanks.

  • Installation of a new 40-ton air-cooled chiller.

  • Installation of two new 750 MBH boilers with a new flue connected to the existing system.

  • Installation of new pumps, an expansion tank, an air separator, and all associated piping.

  • Construction of a new 8' wooden fence enclosure for the chiller.

Status: Completed

Industrial

Columbus Truck
Maintenance Shop

Client: Delta Industries, Inc.

Project Location: Columbus, MS

Project Scope:

  • New 4,340 SF pre-engineered metal building for truck maintenance

  • The facility includes a main shop, wash bay, office space, and a storage mezzanine

  • Mechanical systems include infrared heaters, a High-Volume Low-Speed (HVLS) fan, and a ductless mini-split system for the office

  • Plumbing systems feature a sanitary pump station and oil/water separator for shop drainage

  • The project includes an emergency eyewash and shower station

Wayne - Sanderson Farms

Client: Sanderson Farms, Inc.

Project Location: Multiple Locations

Project Scope:

Provided HVAC, Plumbing, and Fire Protection design and construction administration services for multiple new approximately 180,000 sq. ft. processing plant facilities and 52-machine hatcheries. The new processing plants and hatcheries are located at the following locations:

  • Moultrie, GA

  • Waco, TX

  • Kinston, NC

  • Palestine, TX

  • St. Pauls, NC

  • Tyler, TX

     

     

Commercial Offices

200 Renaissance – Class A Office Tower

Client: H.C. Bailey / 200 Renaissance

Project Location: Ridgeland, MS

Project Scope:

  • 12-story, ~338,000 SF core/shell with 7-story, ~344,000 SF parking garage.

  • Central energy recovery and condensate recovery for cooling tower makeup.

  • Dedicated condenser water heat-exchanger loop serving distributed computer room equipment.

  • Full HVAC, Plumbing, and Fire Protection design and CA.

  • Status: Completed

Mississippi Department of Transportation (MDOT) Headquarters

Client: MDOT

Project Location: Jackson, MS

Project Scope:

  • 10-story, ~150,000 SF office with production areas, computer/plotter rooms, dining, and auditorium.

  • Full MEPF design including computer room environmental control.

  • Construction administration and phased coordination with attached parking deck.

  • Status: Completed

RSA Judicial Office Building (with Historic Courthouse Integration)

Client: Retirement Systems of Alabama

Project Location: Montgomery, AL

Project Scope:

  • New 13-story, ~480,000 SF Class A office encapsulating a renovated ~40,000 SF historic judicial building.

  • Chilled water plant: (3) 875-ton centrifugal chillers + cooling towers; BMS for HVAC, lighting, pumps, and fire pump.

  • Combination standpipe/sprinkler system; domestic booster; terrace irrigation piping.

  • Separate 40,000 SF data center with independent (3) 800-ton chiller plant and HX backup from main system.

  • Status: Completed